Construction Ensues...
Funny thing.
When the original owner built our present house in 1963, they put in a FRONT door and a CARPORT door, and a hidden basement door under the front porch, but oddly enough...
NO BACK DOOR.
For the past 13 months we've relegated ourselves to walking out through the kitchen and turning the corner across the carport to the back yard Turbo Pup pool compound.
While the floor plan is typical for that period, the realtor admitted after we purchased it that only having 1-1/2 baths and no patio or deck on the building had helped us get the great deal we enjoyed because families today expect/need at least two full bathrooms and private play/entertaining space out of sight of the street.
I've been committed to upgrading the marketability of the property while at the same time improving the features for our own use while we live here in Knoxtown on the banks of the Mighty Tennessee River....thus I've designed a future rear addition which will add additional closet space and a full bath to the master bedroom, and an expansive deck serving one if not two new doors on the back of the building.
Trouble is, with the long term uncertainty of my present consulting injuneering situation we've had to postpone the rear bath addition but instead of dumping the deck plans entirely I've managed to come up with a three phase plan which allows us to build a minimum initial plan with well conceived aesthetic additions which can be added in the future as cash flow permits.
Phase I material are being ordered today, and hopefully the construction will be completed sometime in the next hundred years as it requires replacing an existing window in a brick wall with a french door and some other technical complications.
Of course I'm doing the labor myself with the aid and support of Pat and Missy the Turbo Pup.
Wish us luck...if you will...